The refinery expansion was aimed at improving the edible oil refinery capacity by building new facilities and upgrading the existing plant.

The project included the extension of an existing refinery framed with steel at a height to 17m, the increase in height of an existing refinery from 17m to 24.5m, planning and design of new steel frame building for an acid oil plant, planning & design of a new boiler and 6 nos. tank foundations, a new ETP building, a new cooling tower, blow & filling/packaging of finished goods section within an existing warehouse with mezzanine floor for storage, the soil stabilization of new site, planning & design of a 440 m2 warehouse with eave height of 9.4m, and the planning & design of a cloak room, roads and drains.

We provide innovative solutions and work with integrity to the highest standards of  safety and quality. We look forward to working with you.

Address

9, Bakare Street, Off Oriola Street, Ketu, Lagos.

Phone numbers

08023353643, 08071890226, 08034540879

Office Hours

Monday – Friday: 9am-6pm

Email

projectpotentials@yahoo.co.uk