Client: Chi ltd
Scope of work:
Extension of an existing warehouse and introduction of a suspended floor to accommodate all hygiene/wet rooms. The New floor is supported on steel frames and founded on pad. Level of Involvement; Structural design and supervision.
Key design features:
- Foundation- strap foundation(pad first with tie beam)
- Super structure- steel frame with 17m clear span industrial hygiene room floor supported with castellated steel sections as primary beams.
Status: completed
