Client: Chi ltd

Scope of work:

Extension of an existing warehouse and introduction of a suspended floor to accommodate all hygiene/wet rooms. The New floor is supported on steel frames and founded on pad. Level of Involvement;  Structural design and supervision.

Key design features:

  • Foundation- strap foundation(pad first with tie beam)
  • Super structure- steel frame with 17m clear span industrial hygiene room floor supported with castellated steel sections as primary beams.

Status: completed